Day 6 ended with the framing being finished and Day 7 had some plumbing work done.
The bathtub.
Roughed in linen closet.
The half-wall in the kitchenette area.
Sink and dishwasher plumbing.
Down the hallway.
Encasing a support pole.
The HVAC people will re-route this air intake and then this will be made into a storage area.
The great room.